On 29.03.2010 I ordered the Duster 4×4 Diesel, 81Kw , at the dealer. At that time I was told that the non-binding delivery time would be about 12 to 14 weeks. Today I got the notification that my vehicle would go into production in the 39th week. After that the delivery would take place after a further 4 to 5 weeks. I am now quite shocked. What has gone wrong? One advantage has the whole story. My previous car I have already started Since then I have been driving about 20 km to work every day and have already lost 7 kilos (from 106 to 99).