Meal Volvo friends, the successor of my V50 has just been ordered – after laaangem back and forth (V60 vs V70 vs XC60, Mondeo, Mégane, …) it has become a V70 after all: V70 D4 Geartronic Edition Silvermetallic (oyster grey has unfortunately flown out of the progamm) T-Tech interior equipment anthracite, sanded silver inlays Driving assistance package Winter package Pro Volvo On Call Composite glass PDC front boot fixing system Eyewear holder Not wheel Defall Engine designation For almost the same money, however, my OHL et moi have decided for various reasons against leather seats and for understatement level regulation I saved myself like at the V50, AHK/ängerbetrieb/Fahrradräger are not relevant. Due to medium-term family planning, I took the V70 wg. space and volume in the trunk, less because of constantly maximum load in the rear compartment.