My new A-pillars

The MT should find its place together with the HT in the A-pillar. Initially, the HT should not be involved….. but take a look at New A-pillars, 2 self-sawed MDF-rings and 2 cardboard cups served as a base, bitle power glue to it…. then looked like thishttp://s5.directupload.net/file/d/1250/4yxn8u49_jpg.htm afterwards I laminated the whole thing at http://s4. directupload.net/file/d/1250/m3u7phfp_jpg.htm Now it was time to spat (black SMC carbon spatula, advantage…glass fiber and finish in one)http://s2.directupload.net/file/d/1250/mz7ddm28_jpg.htm After twice spatling and 24 hours later it was clear that the HT should be clean with…..that looked like this.http://s5.directupload.net/file/d/1250/6ayjaplq_jpg.htm again stood after spatling and grinding, now it looked quite acceptable already http://s5.directupload.net/file/d/12 50/crylpy93_jpg.htm now it’s been done…GRRRR!!!…but it’s been done…http://s3.directupload.net/file/d/1250/i83fhcva_jpg.htm now the future LS were allowed to sit here once a sample of the pagehttp://s4.directupload.net/file/d/1250/zo8krzf3_jpg.htm and once directly http://s2.directupload.net/file/d/1250/micz69yo_jpg.htm the rest is in work